Good evening, good evening everyone.

00:00:02.458 --> 00:00:14.588
Welcome to the Fall River Planning Board committee meeting, and we have, um, on Wednesday, September 9th, 2026, starting exactly at 5:30 PM.

00:00:15.200 --> 00:00:24.605
We have sign-up sheets in the back for any public comments, and that will be addressed during the process and towards the end for any Q&A.

00:00:25.472 --> 00:00:33.857
Our first line above, um, to proceed with is the reading of the open letter meeting law.

00:00:34.596 --> 00:00:39.218
It's chapter, um, Mass General Law Chapter 30A, Section 20.

00:00:39.878 --> 00:00:49.957
Pursuant to open meeting law, any person may make an audio or video recording of this public meeting or may transmit the meeting through any medium.

00:00:50.762 --> 00:01:02.572
Attendees are therefore advised that such recordings and transmissions are being made, whether perceived or unperceived, by those present and/or deemed acknowledged and permissible.

00:01:03.504 --> 00:01:06.255
With that, I'd like to do a roll call starting to my right.

00:01:09.730 --> 00:01:10.038
Present.

00:01:11.286 --> 00:01:12.178
Gloria Pacheco?

00:01:12.243 --> 00:01:12.583
Present.

00:01:13.313 --> 00:01:13.945
To my left.

00:01:14.837 --> 00:01:15.421
Orlando?

00:01:15.745 --> 00:01:16.166
Present.

00:01:16.783 --> 00:01:26.340
Also in the room is Dan Pacheco, who is the director of Engineering and Planning.

00:01:26.460 --> 00:01:28.100
It's all right, I'm going to change it.

00:01:28.100 --> 00:01:28.850
I'm going to change it.

00:01:29.420 --> 00:01:30.100
I'm going to change it.

00:01:30.300 --> 00:01:31.620
I appreciate that.

00:01:31.700 --> 00:01:33.480
Sorry, Dan Aguiar.

00:01:33.480 --> 00:01:34.360
That's racial.

00:01:34.360 --> 00:01:37.460
And, uh, if you weren't nefarious, I'd take offense to it.

00:01:37.460 --> 00:01:39.560
I know, I know.

00:01:39.560 --> 00:01:44.380
And to, uh, in our court is Felicity Parker.

00:01:44.380 --> 00:01:49.740
And also recording this evening is Craig Salvador from Fred TV.

00:01:49.740 --> 00:01:53.550
With that, we have our old business news.

00:01:53.550 --> 00:02:07.950
Our first one is the roadway reconstruction, Spring Street, Section 66-185 City Ordinance, considering the roadway reconstruction plan and profile of Spring Street.

00:02:07.950 --> 00:02:12.830
It was voted to table this reconstruction on September 9th, 2025.

00:02:12.830 --> 00:02:16.290
Dan, could you please proceed with where we are with this project?

00:02:16.290 --> 00:02:20.930
So we received revised plans and supplemental information on August 26th.

00:02:20.930 --> 00:02:22.510
We sent that package to the Department of Community Utilities for review.

00:02:25.370 --> 00:02:28.583
We did finally get comment back from them at about 11:50 today.

00:02:29.563 --> 00:02:41.243
I did at that point send over a concise set of comments, which you have in your package, that email to the applicant with some outstanding items that need to be addressed.

00:02:41.291 --> 00:02:44.151
Some of them are fairly technical engineering.

00:02:44.199 --> 00:02:46.721
Some of them are more logistical.

00:02:48.199 --> 00:02:56.505
But I think it would probably be good to have the applicant provide the a small presentation of where they're at, and then we can talk about the comments that need to be resolved.

00:02:56.990 --> 00:02:57.168
Okay.

00:02:57.798 --> 00:03:00.223
Could the individuals please come forward?

00:03:05.960 --> 00:03:10.110
Please state your name, address, and the project, please.

00:03:11.240 --> 00:03:11.773
Thank you, Mr.

00:03:11.870 --> 00:03:15.442
Chair, members of the board, Mr. Raghiar.

00:03:15.523 --> 00:03:16.010
There you go.

00:03:16.399 --> 00:03:16.546
Thank you.

00:03:16.627 --> 00:03:18.882
Madam Clerk, for the record, my name is Arthur Frank.

00:03:19.248 --> 00:03:23.015
I'm a lawyer with address of 209 Bedford Street, Fall River, Massachusetts.

00:03:23.560 --> 00:03:27.006
I represent the applicant, Tiverton Investments, LLC.

00:03:27.824 --> 00:03:34.541
The principals of Tiverton Investments are here tonight, David Malkin, Samuel Malkin, and Mark DeMello.

00:03:35.021 --> 00:03:37.394
And with me also is the engineer, Bill Smith.

00:03:38.869 --> 00:03:41.914
What Mr. Aguiar had earlier stated is correct.

00:03:42.395 --> 00:03:52.817
There's been various exchanges of information these past few months, and this morning he was able to get us 7 bullet points that have to be addressed.

00:03:53.283 --> 00:04:00.828
So, not being an engineer, I'm going to defer to Mr. Smith to answer them as best as he can, and I'll help him out if he needs some help.

00:04:01.005 --> 00:04:01.486
Perfect, thank you.

00:04:01.968 --> 00:04:02.321
Good evening.

00:04:02.835 --> 00:04:04.729
Bill Smith from Civil Engineering Concepts.

00:04:05.564 --> 00:04:07.089
Nice to be back before you.

00:04:07.988 --> 00:04:12.483
We did make some changes to the plan that you previously saw.

00:04:13.270 --> 00:04:21.348
And essentially, we have met with the town of Tiverton, since this— let me refresh everybody's memory.

00:04:24.530 --> 00:04:30.876
Bolduc's Lane comes down from Crandall Road, heads this way.

00:04:31.265 --> 00:04:32.592
Bolduc's is improved.

00:04:33.442 --> 00:04:34.217
It's paved.

00:04:34.813 --> 00:04:38.765
It's 10 to 12 feet in width to a point.

00:04:39.233 --> 00:04:44.956
The state line, City of Fall River, Town of Timberton, line is right through here.

00:04:45.651 --> 00:04:51.027
Our clients have some property on the Tiverton side of the state line.

00:04:52.620 --> 00:05:03.764
The access would become from Bolduc's, across approximately 240 feet of Fall River, and then it would get into the Tiverton property.

00:05:03.829 --> 00:05:11.990
There's another 200, close to 300 feet to complete the Spring Street extension.

00:05:12.535 --> 00:05:21.543
So, a total of roughly 550 feet of roadway is being proposed to provide frontage for the Diverton lots and access for those lots.

00:05:22.105 --> 00:05:27.243
This was part of a turn-of-the-century subdivision called Stafford Heights.

00:05:27.950 --> 00:05:33.152
All of these lots, right-of-ways, roadways, those are all existing.

00:05:33.345 --> 00:05:38.421
We're trying to improve what was previously subdivided.

00:05:39.031 --> 00:05:40.911
And that's, that's kind of where we were.

00:05:40.976 --> 00:05:43.514
We had discussions about stormwater.

00:05:44.028 --> 00:05:46.599
We did some soil testing at Dan's request.

00:05:47.708 --> 00:05:49.540
Those results were satisfactory.

00:05:50.198 --> 00:05:52.126
We adjusted the design a little bit.

00:05:52.303 --> 00:06:07.018
And we are proposing a pervious asphalt surface with a reservoir course and the various requirements that make up the pervious asphalt.

00:06:09.946 --> 00:06:17.595
Rhode Island and Massachusetts have slightly different details on their standards, so we've incorporated both standards.

00:06:18.850 --> 00:06:22.776
So, the Massachusetts work will be done to the Massachusetts stormwater standards.

00:06:22.841 --> 00:06:26.606
The Rhode Island work will be done to the Rhode Island stormwater standards.

00:06:27.072 --> 00:06:36.785
And they'll essentially be seamless at the state line, so there won't be any elevation differences or anything substantial there.

00:06:43.708 --> 00:06:52.545
The roadway itself is to act as our infiltration component, so any water that falls on the roadway will percolate down through.

00:06:53.042 --> 00:06:59.113
Go into the reservoir course, and then ultimately infiltrate into the underlying ground.

00:07:00.430 --> 00:07:12.299
So, we do have some stormwater attenuation to make sure that our post-developed road meets the pre-developed water standards on the property.

00:07:12.396 --> 00:07:18.933
I can quickly go through those 7 items and try and respond to Dan's comments.

00:07:19.286 --> 00:07:26.922
The first one had X— actually, it's a multi-part comment, but proposed method of stormwater mitigation is unacceptable.

00:07:27.564 --> 00:07:31.896
So what we're proposing is that we use the pervious asphalt.

00:07:32.136 --> 00:07:45.163
And again, the— we'll have soil and vegetation on the sides of that where the pavement is, we will— it's porous, water pours through it.

00:07:45.470 --> 00:07:55.212
Infiltrates into the ground so that we don't have any excess water, or any water in excess of what runs off the property now.

00:07:58.140 --> 00:08:07.800
Presently, the topography kind of puts— it's a fairly small watershed, but it pushes everything down towards the southern intersection with Bolduc's Lane.

00:08:07.946 --> 00:08:09.858
And we are doing the same thing.

00:08:10.457 --> 00:08:22.581
Within our stormwater system, we've created check dams so that the water will actually be held in certain levels as it gets into the roadway.

00:08:22.886 --> 00:08:24.376
There's a slight slope to the road.

00:08:24.488 --> 00:08:28.350
It's approximately 2.3% at the maximum slope.

00:08:28.815 --> 00:08:34.808
So this will contain those water in those cells so that they do infiltrate into the ground.

00:08:35.689 --> 00:08:40.031
There's a question about the provided time of concentration is questionable.

00:08:40.511 --> 00:08:41.778
I've looked at that.

00:08:42.034 --> 00:08:43.846
We've looked at the numbers.

00:08:44.504 --> 00:08:45.257
I think it's consistent.

00:08:45.337 --> 00:08:46.235
I'll look at it again.

00:08:46.283 --> 00:08:55.984
We did have store well in excess of what we needed to meet our pre-developed runoff criteria.

00:08:56.385 --> 00:08:59.158
So, I think we were slightly overdesigned.

00:08:59.335 --> 00:09:02.638
But, I can look at that time of concentration number.

00:09:04.081 --> 00:09:08.714
Upgrading attenuation of runoff is possible on property owned by the applicant.

00:09:09.555 --> 00:09:18.367
If you look at the subdivision, there was a series of many small, small lots through here.

00:09:19.161 --> 00:09:21.656
So, there's not a lot of room.

00:09:21.834 --> 00:09:25.024
You can kind of see it up in here.

00:09:25.153 --> 00:09:33.415
But, these show one or multiple lots that are currently the assessor's designation.

00:09:34.430 --> 00:09:44.209
There's very little room to put the septic system, a well, and a stormwater system on, on the upgradient property.

00:09:45.203 --> 00:09:50.300
There was a comment about using the lateral streets for some of the stormwater attenuation.

00:09:51.054 --> 00:09:57.258
And if the board is okay with that, that's— that is an option for us as well.

00:09:58.028 --> 00:10:03.114
Because Spring Street intersects.

00:10:04.206 --> 00:10:11.881
So, Bullocks Lane, then we've got Beach Street, also known as East Street, Maple Street, and then Spruce Street.

00:10:11.929 --> 00:10:14.001
So, there's 3 sections of roadway.

00:10:14.081 --> 00:10:23.249
So, there's the potential to use some of that right-of-way on either side of the roadway to store some stormwater too.

00:10:24.020 --> 00:10:30.356
I think pervious pavement design that we've submitted meets the stormwater criteria.

00:10:32.368 --> 00:10:35.002
And, you know, I stand behind that.

00:10:37.630 --> 00:10:45.086
Collection and runoff disposal of such within the paper streets running perpendicular to Spring Street should be considered.

00:10:45.183 --> 00:10:51.805
I just kind of mentioned the possibility that there is some additional capacity that we could use there.

00:10:51.853 --> 00:10:57.625
But what that would do is it would prohibit any other development from occurring.

00:10:59.006 --> 00:11:09.507
All of this land on the Fall River side owned by the town, owned by the city, owned by individuals, so we might be taking away some of their rights.

00:11:10.567 --> 00:11:17.150
The roadside infiltration swales both west and east of the roadway should be considered.

00:11:17.792 --> 00:11:21.624
The roadway running north and south is 35 feet in width.

00:11:22.377 --> 00:11:25.470
East and west is 30 feet in width.

00:11:26.143 --> 00:11:33.690
Town of Tiverton is asking for us to have at least 20 foot of paved surface, plus 1 foot Cape Cod berm, so 22.

00:11:34.155 --> 00:11:45.243
By the time we have a shoulder on the side for safety, a drainage swale, and then try and regrade back to the adjacent grade, I think we're going to run out of room.

00:11:46.157 --> 00:11:51.353
Again, we'd like to use that pervious system that we've designed.

00:11:52.491 --> 00:11:54.031
If need be, we can do that.

00:11:54.752 --> 00:12:00.125
We might go back to the original infiltration system instead of having seepage pits.

00:12:01.007 --> 00:12:12.554
We could put a shallow stone trench or culverts or, you know, some sort of a stormwater device along the edges of the roadway.

00:12:13.437 --> 00:12:18.575
Again, I still feel that the pervious system is adequate.

00:12:19.442 --> 00:12:27.085
So, the use of porous asphalt specifically on greater than 2% slopes shall need to be discussed with the planning board.

00:12:27.550 --> 00:12:29.847
So, we are— our maximum slope is 2.3%.

00:12:30.601 --> 00:12:32.801
We have 1% where we meet the intersection.

00:12:32.865 --> 00:12:36.863
So, the short portion of that roadway is 2.3%.

00:12:38.714 --> 00:12:44.130
Normal standard, or maximum, is 5% for pervious asphalt.

00:12:44.677 --> 00:12:55.236
So, I ask you to accept our stormwater pervious system.

00:12:56.186 --> 00:13:00.181
The response to the existing way characterization is unsuitable.

00:13:00.277 --> 00:13:03.284
Dan clarified that for us just a few minutes before.

00:13:04.098 --> 00:13:08.340
So, Bullock's Lane is approximately 10 to 12 feet in width.

00:13:08.919 --> 00:13:11.361
It's paved.

00:13:11.651 --> 00:13:15.058
On the Tiverton side of it, the town maintains the road.

00:13:15.106 --> 00:13:15.846
They plow the snow.

00:13:15.926 --> 00:13:16.746
They pick up trash.

00:13:17.453 --> 00:13:21.118
On the Fall River side, it does turn to gravel.

00:13:23.619 --> 00:13:25.580
Trash collection is done by the city.

00:13:25.678 --> 00:13:31.292
In fact, they use this portion of Spring Street as to turn around to come in and out.

00:13:31.983 --> 00:13:39.274
Both Tiverton and Fall River have had a small section in here that was used for, like, a T-type turnaround.

00:13:40.103 --> 00:13:41.468
So, it is being maintained.

00:13:43.072 --> 00:13:45.222
Emergency calls are being handled.

00:13:46.791 --> 00:13:51.528
We agree that it's not perfect, but it is a system that is working.

00:13:57.532 --> 00:14:02.429
The Bolduc's Lane shall be improved to the same standard and shall be located within the right-of-way.

00:14:02.767 --> 00:14:12.465
A small portion of Bolduc's Lane strays from the actual platted right-of-way, as you can see on the east side over here.

00:14:13.091 --> 00:14:27.453
I think what's being requested is that Bolduc's be built to whatever we're ultimately end up with constructing here the 20-foot-wide paved surface up through here.

00:14:30.576 --> 00:14:39.009
Again, this portion on the Fall River side is existing.

00:14:39.516 --> 00:14:47.513
It certainly has adverse possession, if that's the right terminology, that it's It's there now.

00:14:49.956 --> 00:15:02.165
I think our clients would prefer not to, but if we had to, we would consider improving that section of Bolduc's between Spring Street and the Timberton Line.

00:15:07.880 --> 00:15:13.029
Ongoing maintenance responsibility of the proposed roadway and system of drainage is not been secured.

00:15:13.499 --> 00:15:23.175
So, I think at the end of the day, both Fall River will want to see, as will Tiverton, some sort of a road owners association to maintain the road.

00:15:24.884 --> 00:15:37.571
As a pervious driveway, or pervious roadway, it needs to be swept periodically to make sure that the fines don't get in the voids, so that it functions properly.

00:15:39.173 --> 00:15:44.901
So, there will be documentation that will be put in place for that.

00:15:47.920 --> 00:15:51.776
Dan indicated he will not recommend waiving the roadway monuments.

00:15:52.515 --> 00:15:58.872
So, the reason that we asked for the waiver on that is my land surveyor is registered in Rhode Island.

00:15:58.953 --> 00:16:01.150
He hasn't gotten his Massachusetts registration yet.

00:16:01.941 --> 00:16:02.700
We can do that.

00:16:02.765 --> 00:16:05.333
We'll get a Massachusetts surveyor to assist us.

00:16:05.831 --> 00:16:09.247
And we'll set the monuments that you've requested.

00:16:11.170 --> 00:16:16.830
And then the question was, has the approval from the Town of Tiburon Planning Board and Tiburon Fire Department been obtained?

00:16:17.413 --> 00:16:21.528
So we have met with Tiburon, discussed the project with them.

00:16:21.994 --> 00:16:32.227
They basically sent us to you and said, you know, get your blessing from Fall River, and then we will entertain your application.

00:16:33.781 --> 00:16:41.547
So, they basically put us on hold until, hopefully, you folks can make a decision for us.

00:16:45.873 --> 00:16:47.711
I'm happy to answer any questions you might have.

00:16:49.525 --> 00:16:53.327
First and foremost, I'd like to have Dan just kind of do an overview.

00:16:54.055 --> 00:16:55.397
We did receive these plans.

00:16:55.575 --> 00:16:57.339
We did have some recommendations.

00:16:57.980 --> 00:16:59.855
Of how to proceed with it.

00:17:00.340 --> 00:17:14.076
But, it seems to me like you tried to address some of those questions within a day, but I don't even know if the city's engineering or site plan approval process or anything of that nature has been kind of gone through.

00:17:14.622 --> 00:17:18.009
No, we haven't got anything back since these comments went out, which was only today.

00:17:18.495 --> 00:17:29.177
But, just to hit on a couple of them, I don't think Although I'm not opposed to porous asphalt, it's not a surface that's really allowed by your regulations.

00:17:29.274 --> 00:17:34.958
So a waiver of not being paved is something that we've got to deal with, the maintenance issue of it all.

00:17:35.488 --> 00:17:41.910
I have a concern about porous asphalt does not capture and infiltrate all rainwater.

00:17:42.392 --> 00:17:48.975
So there will be storm events where this water will now be channelized through this roadway section and run to the intersection of Bolduc.

00:17:49.710 --> 00:17:58.496
And will most likely either puddle there, will continue on to another abutter's property, Mr. Bolduc, who owns the property across the street.

00:17:58.933 --> 00:18:04.888
So I just want to make sure that if water is going to be making it to Bolduc, what's happening when it does hit Bolduc.

00:18:06.736 --> 00:18:16.980
Some of the different creative ideas of how drainage can be handled here, I'd be more than willing to sit and meet with the engineer and the applicant to discuss some different ways of handling this.

00:18:17.077 --> 00:18:29.332
It's not all that different from Monarch and Bach that we also have on tonight's agenda about ways of— and when I talk about utilizing the perpendicular right of ways, it's not for the storage.

00:18:29.525 --> 00:18:40.543
It could be for— you could collect water in intervals upgradient with a set of catch basins and discharge them into a swale at some point in the intersecting streets.

00:18:41.972 --> 00:18:45.501
To be a little bit more conventional within the right-of-way.

00:18:46.288 --> 00:18:52.689
I don't think— we could do this exact same thing on another project that's also on tonight's agenda, but I don't see them here tonight.

00:18:53.186 --> 00:18:58.625
So I think there are different ways of trying to wrap your head around what are we doing drainage-wise.

00:18:59.058 --> 00:19:07.721
I don't think we can just count on porous asphalt, which has incredible maintenance responsibilities, to be the save-all here.

00:19:08.123 --> 00:19:13.892
We use it in the City of Fall River more so not to trigger a lot coverage issue.

00:19:14.792 --> 00:19:22.674
But as far as relying upon that for stormwater runoff, it's never happened, especially on a street.

00:19:23.557 --> 00:19:25.020
So I do have some concerns about that.

00:19:25.084 --> 00:19:29.407
So, I mean, it would be my recommendation that we could sit and have a conversation about it.

00:19:29.730 --> 00:19:34.888
I would really like to know what Tiverton thinks about the 12-foot way of Bolduc Lane.

00:19:35.538 --> 00:19:40.769
And extending from that and adding more homes to, to a 12-foot way.

00:19:41.864 --> 00:19:50.624
So I would not, I would not— I mean, if at any point you wanted to consider a conditional approval, it should be based upon Tiverton's assessment of Bulldog Lane.

00:19:51.382 --> 00:19:55.367
Just my— I've worked with all of these types of materials before.

00:19:55.561 --> 00:20:01.484
We usually use them in parking lot areas or the main drive area because it does get salt, it does get plowed.

00:20:01.629 --> 00:20:03.897
It does get— it has to be maintained.

00:20:04.525 --> 00:20:08.530
The lots themselves, they use that for various material.

00:20:08.578 --> 00:20:26.284
But, I think at this point, that there were a bunch of questions that I think it'd be a little unfair to— I would suggest that we table this particular matter until these questions are vetted out between the engineer and them.

00:20:27.697 --> 00:20:29.499
Dan Aguiar, that is.

00:20:29.997 --> 00:20:34.990
And then what we can come up with is, you know, what is the process?

00:20:35.314 --> 00:20:49.655
We're the horse before the cart scenario, and then go back to the city, or the town of Tiverton, and say this is the direction that we would like it to be, and then figure out from that point.

00:20:49.735 --> 00:20:53.139
But, you've done a significant amount of work here, On this.

00:20:53.188 --> 00:20:55.989
I think there's just some pieces that we'll get there.

00:20:56.086 --> 00:20:57.219
There's no, there's no doubt about it.

00:20:57.284 --> 00:21:02.170
But one of the concerns, and I don't know if you watched last night's City Council meeting, but this has been going on for about 6 months.

00:21:03.760 --> 00:21:24.023
Not an identical situation to this, but off of Aruta's Lane, which is just up off of Stafford Road, which feeds down into Greenleaf and Judge Street in the city of Fall River, we have a series of streets, Judge and Greenleaf, with about 20 residents on the South Wachusett Pond that is accessed by a laneway that runs through Aruta's Dairy Farm.

00:21:26.548 --> 00:21:38.328
The homeowners in, in that development are now looking to the city of Fall River to maintain the 1 mile, over 5,000 linear feet of farm road that provides access to their property.

00:21:40.046 --> 00:21:42.411
Um, so we're, we're in the middle of that right now.

00:21:42.492 --> 00:21:45.253
So I want to make sure that this does not become that.

00:21:45.334 --> 00:21:52.093
It's a little bit different here because we're dealing with the right-of-ways, and— but we want to get— and Tiverton turned their back on these people.

00:21:52.336 --> 00:21:52.514
Sure.

00:21:52.821 --> 00:21:55.017
I deal with this all the time, as you know.

00:21:55.162 --> 00:22:08.544
And I, again, not only does it need to be communicated between the two, but there needs to be items in place legally binding that, you know, who's going to maintain it, who's going to do emergency response operations.

00:22:08.983 --> 00:22:17.910
And again, I think at this point, I would recommend, we've heard this, I would recommend that we table this until the next meeting.

00:22:18.120 --> 00:22:23.190
And hopefully between now and then, that you guys can come up with your given solutions.

00:22:23.440 --> 00:22:25.820
And ultimately, we're going to inherit it.

00:22:26.120 --> 00:22:27.110
Dan's going to inherit it.

00:22:27.200 --> 00:22:30.100
The maintenance department's going to inherit whatever it might be.

00:22:30.100 --> 00:22:32.720
And so, I think we need to have his blessing.

00:22:33.300 --> 00:22:48.605
Because what will happen is once everybody in this room is gone, one of those homeowners will come to the City Council of Fall River and petition for these streets to become accepted streets where we maintain them, we plow them, we pick up trash, all things that we shouldn't be doing already, but we do.

00:22:50.182 --> 00:22:53.742
And then homeowners become incredibly entitled that, no, you have to.

00:22:54.193 --> 00:22:54.999
Well, no, there's a difference.

00:22:55.821 --> 00:22:59.208
Are we legally bound to, or do we do it just to be good people?

00:22:59.632 --> 00:23:01.964
So we want to make sure that all those items are addressed.

00:23:02.248 --> 00:23:07.613
I'm available whatever time and date you want to meet as a group, as early as tomorrow, Friday.

00:23:07.789 --> 00:23:10.455
So, I mean, I don't want this to go on another meeting.

00:23:10.504 --> 00:23:11.483
I want to get this resolved.

00:23:11.564 --> 00:23:16.125
And I honestly think a 30-minute conversation can get that resolved.

00:23:16.543 --> 00:23:17.603
If you've got time tomorrow, Dan.

00:23:17.731 --> 00:23:17.908
I do.

00:23:17.972 --> 00:23:19.193
What time do you think is good for you?

00:23:19.578 --> 00:23:20.381
I'll talk to Bill.

00:23:20.687 --> 00:23:22.855
Bill's the busiest one out of all of us.

00:23:23.096 --> 00:23:23.931
Well, maybe other than Arthur.

00:23:23.979 --> 00:23:27.545
He's got to come up with solutions, answers, and get them back to you.

00:23:27.609 --> 00:23:29.388
Tomorrow is Would Friday work better?

00:23:29.615 --> 00:23:30.085
Friday could.

00:23:30.264 --> 00:23:34.255
I have a— currently I have a 9 and a 10, but other than that I can be available on Friday.

00:23:35.040 --> 00:23:35.556
1 o'clock?

00:23:35.718 --> 00:23:36.912
You're killing me on a Friday, but that's fine.

00:23:37.251 --> 00:23:38.769
No, for you, I'll be here at 1.

00:23:38.930 --> 00:23:40.480
11 would be better.

00:23:42.313 --> 00:23:42.426
Yeah.

00:23:42.474 --> 00:23:45.277
Can I— again, but what you both said, I agree.

00:23:45.374 --> 00:23:51.973
And again, number 5, the ongoing maintenance, maybe the developer will consider turning the street over to the town of Tiverton.

00:23:52.436 --> 00:23:55.130
At least that would be one less headache to 20 years from now.

00:23:55.130 --> 00:23:56.610
Yeah, Tiverton will never accept this.

00:23:56.610 --> 00:23:59.130
They won't take up that road in Massachusetts.

00:23:59.130 --> 00:23:59.690
They never will.

00:24:00.230 --> 00:24:02.770
Yeah, different standards.

00:24:02.770 --> 00:24:06.850
And it's not— how long is Bolduc now, linear footage, out to Crandall?

00:24:07.190 --> 00:24:10.330
Oh boy, that's just rough.

00:24:10.330 --> 00:24:12.930
But at least, at least the maintenance, about 1,000 feet.

00:24:12.930 --> 00:24:15.730
And that, and that's, that's private as well, right?

00:24:15.730 --> 00:24:17.690
They're actually plowing and maintaining it.

00:24:17.690 --> 00:24:21.050
That again, we'll go back to my comment, 30 visits.

00:24:21.050 --> 00:24:25.147
Just because they do it doesn't mean it's their responsibility or their street.

00:24:25.243 --> 00:24:27.439
Is it an accepted street in Tiverton?

00:24:27.952 --> 00:24:28.994
An accepted way?

00:24:29.474 --> 00:24:32.776
I have to fight that argument with the council.

00:24:33.161 --> 00:24:37.874
I believe the Tiverton police chief lives on Bulldog, so— oh, there you go.

00:24:38.627 --> 00:24:40.807
So for now, we're okay, right?

00:24:41.977 --> 00:24:49.767
But no, but if the board does— but if the board does want to, you know, I don't want you to rush and act on it tonight and not be favorable.

00:24:49.880 --> 00:24:57.020
So if you want to request that the matter be tabled, I'll make sure that I'm available to— I'm not comfortable.

00:24:57.020 --> 00:24:58.080
I think there's too much outstanding.

00:24:58.200 --> 00:24:59.750
I think it can be worked out, no problem.

00:25:00.480 --> 00:25:00.780
Okay.

00:25:00.780 --> 00:25:02.940
But I don't know.

00:25:02.940 --> 00:25:05.280
I'm not— Orlinda, Beth, I don't know.

00:25:05.280 --> 00:25:06.150
What are you guys thinking?

00:25:06.640 --> 00:25:07.500
I'm agreeing with you.

00:25:07.500 --> 00:25:08.710
It's a little bit of a nonce.

00:25:10.280 --> 00:25:10.720
Yeah.

00:25:10.720 --> 00:25:16.040
I mean, this feedback is great, Dan, but I think you have an opportunity to address all the issues.

00:25:17.012 --> 00:25:17.577
Should be okay.

00:25:17.658 --> 00:25:17.706
Yeah.

00:25:17.755 --> 00:25:20.756
Isn't that why they are having a meeting on Friday at 11?

00:25:20.901 --> 00:25:21.079
Yep.

00:25:21.304 --> 00:25:21.772
To discuss.

00:25:22.256 --> 00:25:22.579
Yeah.

00:25:23.144 --> 00:25:24.677
Can I have someone motion to table?

00:25:25.322 --> 00:25:28.097
Make a motion we table this to the next meeting in October.

00:25:28.486 --> 00:25:28.876
Second.

00:25:29.152 --> 00:25:29.883
Second.

00:25:30.451 --> 00:25:31.036
Roll call, please.

00:25:31.778 --> 00:25:31.908
Yes.

00:25:32.830 --> 00:25:32.960
Yes.

00:25:33.818 --> 00:25:34.076
Yes.

00:25:37.200 --> 00:25:38.025
Friday at 11.

00:25:38.495 --> 00:25:43.675
Mr. Chairman, is there anybody in the audience that had any comments so that we could— Is there?

00:25:43.837 --> 00:25:44.712
Yeah, I apologize.

00:25:44.890 --> 00:25:48.270
Is there anybody in the would like to make a comment at this point?

00:25:48.330 --> 00:25:50.080
Usually we wait till the end, but that's okay.

00:25:50.390 --> 00:25:52.120
Why don't we do this right after your presentation?

00:25:52.850 --> 00:25:59.420
Is there anybody here that would like to speak for or against the project, or even our decision?

00:26:01.290 --> 00:26:03.790
Just wanted to— we do.

00:26:03.790 --> 00:26:05.550
We know everybody and what they're here for.

00:26:05.550 --> 00:26:06.750
Yeah.

00:26:06.750 --> 00:26:08.250
Thank you.

00:26:08.250 --> 00:26:08.330
Thank you.

00:26:08.330 --> 00:26:08.530
Thank you.

00:26:08.530 --> 00:26:09.900
We'll see you guys on Friday.

00:26:10.330 --> 00:26:10.410
Thank you.

00:26:10.410 --> 00:26:10.890
Appreciate it.

00:26:10.890 --> 00:26:11.630
5 of them will leave.

00:26:11.630 --> 00:26:12.500
Thank you very much.

00:26:12.690 --> 00:26:13.690
Thank you.

00:26:46.740 --> 00:26:47.566
Thank you.

00:26:47.874 --> 00:26:48.604
Thanks again, Bill.

00:26:48.863 --> 00:26:49.122
Thank you.

00:26:50.241 --> 00:27:04.860
Okay, for old business item number 2, which is the roadway reconstruction vacant wooded lot off of Bark Street, Norwood Street, and Larnach Street, Section 66-1.

00:27:05.466 --> 00:27:16.095
185 City Ordinance considering the roadway reconstruction application for the vacant wood lots off Clark Street, Norwood Street, and Monarch Street.

00:27:16.834 --> 00:27:18.536
Dan, can you give us an overview of this, please?

00:27:18.744 --> 00:27:28.362
So after the last meeting, if you recall, we had— didn't— Alex didn't give much of a presentation because he was in the process of revising plans with our initial comments.

00:27:29.245 --> 00:27:41.476
He sent back in what I would consider a draft conceptual plan and the ideas that he wanted to implement, not a full set of drawings that could be technically reviewed and comments provided.

00:27:42.053 --> 00:27:45.146
We had sent a copy of that to DCU just for their initial comments.

00:27:45.194 --> 00:27:46.524
We have not received them back.

00:27:47.373 --> 00:28:05.901
I can tell you what he did submit wasn't sufficient to me in the proper direction, so I've asked them to similarly, as the last project, sit down, let's discuss how we can move forward in an expeditious way and make sure that we have all I's dotted and T's crossed engineering-wise before you're asked to act on that.

00:28:05.981 --> 00:28:14.282
So with that, the applicant's actually not here this evening, and I would recommend that we table the matter until they can provide a complete set of plans that can be reviewed.

00:28:15.294 --> 00:28:19.244
Okay, so I would make the recommendation— I do, we do have one neighbor here.

00:28:19.533 --> 00:28:21.106
Do you have any other questions you want to add?

00:28:22.279 --> 00:28:28.447
So again, before the next meeting, if you want to call even before, we'll let you know, is anything submitted?

00:28:28.544 --> 00:28:29.255
Are we even close?

00:28:29.691 --> 00:28:30.805
Just so you don't have to come out again.

00:28:31.402 --> 00:28:31.726
Okay.

00:28:31.871 --> 00:28:33.004
Just a question for you.

00:28:33.263 --> 00:28:38.167
Would it be advantageous if you wanted to speak upon this, either for or against it?

00:28:38.345 --> 00:28:44.355
And so perhaps whoever is watching this could perhaps maybe try to address whatever concerns you have.

00:28:44.420 --> 00:28:45.276
No, we did last month.

00:28:45.534 --> 00:28:46.519
My husband spoke last month.

00:28:47.600 --> 00:28:49.155
Yeah, do whatever you want.

00:28:49.820 --> 00:28:49.982
Okay.

00:28:50.533 --> 00:28:50.647
All right.

00:28:50.695 --> 00:28:54.245
With that, then could I have a motion to table this until the next meeting?

00:28:54.374 --> 00:28:56.092
I'll motion to table until the next meeting.

00:28:56.648 --> 00:28:57.808
I'll second.

00:28:58.726 --> 00:29:00.143
Orlando second.

00:29:00.723 --> 00:29:01.400
Roll call.

00:29:01.867 --> 00:29:02.124
Beth?

00:29:02.350 --> 00:29:02.608
Yes.

00:29:03.220 --> 00:29:03.558
Gloria?

00:29:03.638 --> 00:29:04.025
Yes.

00:29:04.428 --> 00:29:04.766
Orlando?

00:29:04.991 --> 00:29:05.185
Yes.

00:29:05.718 --> 00:29:06.617
And Michael Ferris?

00:29:06.715 --> 00:29:06.895
Yes.

00:29:07.026 --> 00:29:09.348
We'll table it to the next meeting.

00:29:11.480 --> 00:29:13.690
Item number 3 under old business.

00:29:13.690 --> 00:29:24.970
We have the King Phillips Estate subdivision, Princeton Circle, request to release lot 1 through 14 in exchange of a letter of credit from Bay Coast Bank.

00:29:24.970 --> 00:29:27.170
Do we have anybody here in the audience to speak about?

00:29:27.910 --> 00:29:30.260
Yes, Sean Ainsworth from Insight Engineering.

00:29:32.670 --> 00:29:33.950
Introduce yourself.

00:29:33.950 --> 00:29:35.610
Robert Kofori, the owner.

00:29:35.770 --> 00:29:36.870
Very good.

00:29:36.870 --> 00:29:37.980
Dan, could you give us an overview?

00:29:38.210 --> 00:29:38.770
Sure.

00:29:38.770 --> 00:29:45.493
So Mr. Cafari and his consultants submitted an interim roadway as-built a few weeks ago.

00:29:46.135 --> 00:29:49.873
It has been through review through the Department of Community Utilities and mine as well.

00:29:50.339 --> 00:29:52.826
It was not intended to be a final construction as-built.

00:29:52.906 --> 00:30:18.418
It's for the purpose of reviewing what's been constructed, what still needs to be constructed, so that an estimate can be prepared so that Mr. Cafari's bank could provide a letter of credit to cover the costs of those items in order for us to release the original covenant for the subdivision, which precludes Mr. Cafori from selling any of the lots in the subdivision until either the roadways are complete or until surety is posted.

00:30:19.028 --> 00:30:31.365
So the mechanism that we're at now is, after review, we've recommended a letter of surety in the amount of $200,000 with— I've itemized the outstanding items, which I had given to Mr. Cafori.

00:30:31.461 --> 00:30:32.921
He, in turn, gave to his bank.

00:30:35.150 --> 00:30:40.440
That would be the work that still needs to be cleaned up to determine that the subdivision is 100% complete.

00:30:41.418 --> 00:30:48.199
In your package, you will have a letter of credit, irrevocable letter of credit from Bay Coast Bank in the sum of $200,000.

00:30:48.776 --> 00:31:00.185
It goes through all of the rigmarole of what it covers and what its intention is, which is standard for what this planning board has received in approved in the past.

00:31:00.994 --> 00:31:10.473
With that, you will also see from Attorney Mark Levin is a release of the covenant that had previously been recorded.

00:31:10.845 --> 00:31:13.062
I know there's a bunch of documents in your package.

00:31:13.192 --> 00:31:20.502
We wanted to make sure that you did have everything from the original subdivision decision, copies of the recorded plans, copy of all of the easements.

00:31:21.135 --> 00:31:31.441
All of these items have been reviewed by my office as well as Department of Community Utilities to make sure that they were all done in accordance with the approval of this board back in 2019.

00:31:32.579 --> 00:31:35.577
So if you have any questions, I'd be more than glad to answer them.

00:31:36.026 --> 00:31:43.946
But with what we're— where we're at now, I would recommend that we accept the letter of surety and release the covenant.

00:31:44.619 --> 00:31:55.627
So this is, in reality, this is just kind of preliminary plans, pretty well in advanced in order to show the cost to your bank, your lender.

00:31:56.896 --> 00:31:59.756
Will you— a couple questions for you, Dan.

00:32:00.415 --> 00:32:07.654
Will these become public roads at any point in this development or this process?

00:32:07.960 --> 00:32:16.735
The applicant, the applicant or 10 registered voters have the ability to petition for these to become accepted.

00:32:17.333 --> 00:32:25.697
So once this, once this is completed, at that point, the applicant has the ability to petition the city through the City Council for acceptance.

00:32:25.777 --> 00:32:27.014
It's not just an automatic thing.

00:32:28.169 --> 00:32:35.313
When subdivisions get completely constructed, and even if they're constructed to 110% of what they were supposed to, fantastic.

00:32:35.875 --> 00:32:38.444
But there is a process for them to become city streets.

00:32:39.070 --> 00:32:40.065
That's a separate process.

00:32:40.129 --> 00:32:43.709
That, that's why you'll see them come back to you for recommendation.

00:32:43.966 --> 00:32:46.679
Once the City Council process begins, then we have to review it.

00:32:47.032 --> 00:32:48.670
And say, yeah, so it starts here.

00:32:49.104 --> 00:32:50.597
We say everything's been done fine.

00:32:51.047 --> 00:32:55.912
Then the applicant, maybe a few months later, goes through the city council process, comes back to us.

00:32:56.024 --> 00:33:00.408
They want to make sure that you're okay with it, and then it goes through the rest of the process.

00:33:00.536 --> 00:33:00.665
Okay.

00:33:00.921 --> 00:33:16.580
And then the other question I had— I did review all of this before I came here— and, um, the $200,000, is that what you think the cost is for the full construction, or is that just part of the That is the cost of complete construction, 100%.

00:33:16.901 --> 00:33:34.061
And that complete construction is up to— if we were to take over the city, if the city were to take over this road at some point down the line, that you feel like there's— it's— they have addressed the design guidelines and criteria that are needed.

00:33:34.254 --> 00:33:35.186
So 2 different issues.

00:33:35.684 --> 00:33:45.108
When you say if the city were ever to take over the road, Well, the standards of where— what they're proposing here, would they meet the standards of the city in your review?

00:33:45.413 --> 00:33:51.190
Well, these standards are based upon the subdivision plans that were approved by this board.

00:33:52.313 --> 00:33:58.235
There are a couple of items that were not completed yet because the subdivision is not complete.

00:33:58.316 --> 00:33:58.380
Sure.

00:33:58.974 --> 00:34:05.913
So this is what it would— this is what it would cost for Mr. Caffori to complete the subdivision construction.

00:34:06.349 --> 00:34:23.785
The letter of surety gives us surety that if Mr. Caffore defaults, leaves and defaults on the remaining work, we have the ability for the bank to provide us the funds of $200,000 to complete these items in the subdivision.

00:34:24.141 --> 00:34:25.321
That's what the process is.

00:34:25.580 --> 00:34:26.663
Can I say something?

00:34:26.954 --> 00:34:27.051
Sure.

00:34:27.294 --> 00:34:37.944
I just want to clarify that the subdivision roadway sewer line, water line, gas line has been installed, and the roadway has been paved.

00:34:38.810 --> 00:34:44.757
The only significant thing that needs to be done is paving the second coat in the entire subdivision.

00:34:45.238 --> 00:34:45.912
That's a big item.

00:34:45.960 --> 00:34:46.986
That's $75,000.

00:34:47.226 --> 00:34:47.467
Yes.

00:34:47.707 --> 00:34:49.951
The rest of it— there are a few other things too.

00:34:50.031 --> 00:34:53.414
I mean, some of the drainage needs to be— they have this list.

00:34:53.638 --> 00:34:54.039
Yeah, yeah.

00:34:54.151 --> 00:34:58.210
So the subdivision is built is what I'm trying to say, and there's 2 houses building this subdivision.

00:34:58.210 --> 00:35:02.590
And if I'm not mistaken too, I'm sure that Dan added the 20% above.

00:35:05.090 --> 00:35:09.170
So basically the price to finish the road wouldn't be $200,000.

00:35:09.790 --> 00:35:17.750
I mean, there's a 20% contingency in there, obviously, for interest rates and so on and so forth, and material costs, whatever.

00:35:17.750 --> 00:35:19.610
And I have a heavy pen when it comes to that.

00:35:19.610 --> 00:35:21.340
And he does have a heavy pen.

00:35:21.850 --> 00:35:24.300
I reviewed the estimate.

00:35:25.970 --> 00:35:33.240
The estimate itself was kind of heavy in my mind, but no, Bob accepted it.

00:35:33.240 --> 00:35:38.480
And yeah, well, God knows we're accepting it because our intention is to finish the road and do a beautiful subdivision.

00:35:38.680 --> 00:35:40.700
That's the end result, and build beautiful homes.

00:35:40.700 --> 00:35:41.890
Yeah, that's what we're after.

00:35:41.900 --> 00:35:47.280
So the $200,000, a little heavy, but if we're willing to do the work according to the city standard, we're fine.

00:35:47.280 --> 00:35:55.220
And once— just like we have in other subdivisions— once a portion of this work gets done Mr. Cafuri can come back in and ask for an amended letter of credit.

00:35:55.220 --> 00:36:00.160
He comes in and he's done everything but $20,000 worth of work, then we can release it.

00:36:00.160 --> 00:36:03.040
The bank provides us the funds to complete what's ready to complete.

00:36:03.360 --> 00:36:06.980
So along the way, there are— there is the ability to reduce this, this amount of money.

00:36:06.980 --> 00:36:13.900
Part of these questions that I do ask is less for us and more about the general public when we do these things.

00:36:13.900 --> 00:36:14.940
Of course.

00:36:14.940 --> 00:36:18.400
And so that's why I'm making sure that— but one more thing I want to mention.

00:36:18.400 --> 00:36:26.215
The city requires to hire a consultant that we pay for, that supervises every aspect of the road being constructed.

00:36:26.568 --> 00:36:31.433
Sewer line, they provide pictures, reports, water lines, so on and so forth.

00:36:31.481 --> 00:36:37.101
So it's, it's an extensive thing, and that's how the city protects their interest of what we're doing.

00:36:37.470 --> 00:36:37.727
Thank you.

00:36:38.193 --> 00:36:39.847
So I appreciate that.

00:36:39.975 --> 00:36:40.377
No problem.

00:36:40.939 --> 00:36:43.588
Everything that's been done to date has been done correctly.

00:36:45.196 --> 00:36:45.444
I am.

00:36:46.667 --> 00:36:55.630
Well, with that being said, I think we should approve, approve this, but I can't make a comment, Chair.

00:36:56.178 --> 00:37:02.587
I just want to say, Mr. Kefori, you've done a lot of development in the city, and of course I know you want a development that looks good.

00:37:02.764 --> 00:37:03.022
Thank you.

00:37:03.183 --> 00:37:04.133
You know, so thank you.

00:37:04.230 --> 00:37:05.405
I have all the confidence in the world.

00:37:05.904 --> 00:37:11.297
Then again, the 20% that is added doesn't get done within 5 years, those costs may increase.

00:37:11.519 --> 00:37:12.697
So thank you, Dan.

00:37:12.778 --> 00:37:13.730
Oh, that's one you'll get emailed.

00:37:13.908 --> 00:37:14.118
Yeah.

00:37:14.489 --> 00:37:22.905
So I make a motion that we accept the letter of credit and we release the covenants, lots 1 through 14.

00:37:23.811 --> 00:37:24.637
Do I have a second?

00:37:25.009 --> 00:37:25.721
I'll second that.

00:37:26.757 --> 00:37:27.177
Roll call.

00:37:27.258 --> 00:37:27.630
Beth?

00:37:28.132 --> 00:37:28.407
Yes.

00:37:28.876 --> 00:37:29.216
Gloria?

00:37:29.330 --> 00:37:29.522
Yes.

00:37:30.085 --> 00:37:30.374
Orlando?

00:37:30.487 --> 00:37:30.712
Yes.

00:37:31.274 --> 00:37:32.464
And I, Michael Canarias?

00:37:32.801 --> 00:37:33.026
Yes.

00:37:33.444 --> 00:37:33.701
Thank you.

00:37:34.007 --> 00:37:36.289
I'll present the board with an original letter of credit.

00:37:36.835 --> 00:37:37.205
Okay, good.

00:37:37.318 --> 00:37:38.041
Signed by me.

00:37:38.917 --> 00:37:44.120
Only because the, um, the covenant release requires, uh, notary.

00:37:44.955 --> 00:37:50.382
So give me a day or so to get everybody in with the clerk to be able to sign these things on people's availability.

00:37:50.799 --> 00:37:52.742
As soon as I get it, I'm closing on Monday.

00:37:52.967 --> 00:37:53.641
That's okay.

00:37:53.946 --> 00:37:56.531
Okay, only— there's only Mike needs to sign, right?

00:37:56.596 --> 00:38:00.899
Well, the way that Attorney Levin wrote it, I know, I saw it says the majority of the planning board.

00:38:01.332 --> 00:38:08.092
If you want to edit that and say Yeah, because he has— I believe he has notice of records that he could sign for all of us.

00:38:08.783 --> 00:38:14.740
I, I don't disagree, and that's why on subdivision plans and everything else, the chairman signature is okay.

00:38:15.302 --> 00:38:26.461
I just don't want this to go back to the bank signed, or this release, or to the registry, and the registry comes back and says to us, you need the majority, because that's what Attorney Levin wrote.

00:38:26.943 --> 00:38:31.260
Because I can notarize the signature and stamp it tomorrow, but Well, okay, that would be great.

00:38:31.260 --> 00:38:33.800
You can do everybody's signature if you want and stamp it tomorrow.

00:38:33.800 --> 00:38:34.300
1, 2, 3.

00:38:34.300 --> 00:38:35.210
I could do 3 of them.

00:38:35.240 --> 00:38:35.920
Okay, great.

00:38:35.920 --> 00:38:36.420
Okay, that's fine.

00:38:36.420 --> 00:38:38.220
Um, yeah, we only need 3.

00:38:38.220 --> 00:38:40.000
Yeah, that's fine.

00:38:40.540 --> 00:38:40.860
Perfect.

00:38:40.860 --> 00:38:42.360
That'd be great.

00:38:42.360 --> 00:38:42.990
All right, perfect.

00:38:43.000 --> 00:38:43.500
Thank you.

00:38:43.500 --> 00:38:44.920
See that?

00:38:44.920 --> 00:38:46.470
Thank you, everybody.

00:38:46.660 --> 00:38:49.810
I'll probably end up giving it to, uh, Dan in the office.

00:38:49.820 --> 00:38:50.380
Thank you very much.

00:38:50.380 --> 00:38:52.240
Yeah, we have to give that to the treasurer, so that's good.

00:38:52.240 --> 00:38:53.600
Thank you.

00:38:53.600 --> 00:38:54.920
Nice to see you.

00:38:54.920 --> 00:38:55.740
Don't lose it.

00:38:57.587 --> 00:39:04.121
We have nobody in the audience or here to speak against or for the project.

00:39:04.768 --> 00:39:07.944
So with that, we will say thank you very much for bringing this to us.

00:39:08.008 --> 00:39:08.894
Thank you so much.

00:39:09.120 --> 00:39:09.506
Thank you.

00:39:09.619 --> 00:39:10.070
Thank you.

00:39:10.489 --> 00:39:11.471
Thank you.

00:39:12.744 --> 00:39:13.630
You're welcome.

00:39:14.500 --> 00:39:14.855
Thank you.

00:39:19.600 --> 00:39:33.292
The fourth old business we have is Highland Woods subdivision request for full release of posted surety and therefore return of the original letter of credit on file with the City of Fall River.

00:39:33.727 --> 00:39:33.905
Dan?

00:39:34.340 --> 00:39:46.023
The review of that final as-built and construction has not been completed by the Department of Community Utilities or myself, so we'll have to kick that one down until, until we're ready for it.

00:39:46.346 --> 00:39:49.846
So may I have a motion Motion to table this for the next meeting.

00:39:50.368 --> 00:39:51.004
Motion to table.

00:39:51.265 --> 00:39:52.538
Yeah, you can just leave it till the next meeting.

00:39:54.021 --> 00:39:54.361
Second.

00:39:54.442 --> 00:39:55.349
I second.

00:39:56.110 --> 00:39:56.434
Roll call.

00:39:56.612 --> 00:39:56.823
Beth?

00:39:57.179 --> 00:39:57.406
Yes.

00:39:57.730 --> 00:39:58.168
Gloria?

00:39:58.297 --> 00:39:58.540
Yes.

00:39:59.123 --> 00:39:59.382
Yes.

00:39:59.674 --> 00:40:00.095
Orlando?

00:40:01.051 --> 00:40:01.729
And Michael Perez?

00:40:03.872 --> 00:40:03.953
Yes.

00:40:04.049 --> 00:40:26.753
Okay, that was— for new business, we have a Form A Application for endorsement of plan believed not to require approval for an ANR plan of land, file number 26-1685.

00:40:27.173 --> 00:40:28.644
The owner applicant, June Perry.

00:40:29.032 --> 00:40:32.086
Property location, 311 Crescent Street.

00:40:32.488 --> 00:40:37.935
Assessor's map lot C-07-0001.

00:40:38.514 --> 00:40:48.565
Then So this is a subdivision of an existing parcel of land that's 17,270 square feet located at 311 Crescent Street.

00:40:48.645 --> 00:40:53.416
It's an existing 3-family dwelling that's located at the corner of Crescent and Valentine.

00:40:53.930 --> 00:41:04.194
What this plan does is it subdivides Lot 2, which is frontage along Valentine Street, upwards of the existing home at 311.

00:41:04.467 --> 00:41:06.925
This parcel did need to get zoning relief.

00:41:07.567 --> 00:41:09.639
From the Zoning Board of Appeals, which it did.

00:41:10.297 --> 00:41:13.171
That decision was recorded at the Registry of Deeds.

00:41:13.428 --> 00:41:18.165
Notation of that is on the plan, and I believe that decision was also forwarded to all of you as well.

00:41:18.743 --> 00:41:25.294
The plan has been in accord— has been designed and submitted in accordance with what was provided and approved through the Zoning Board of Appeals.

00:41:25.952 --> 00:41:30.095
So with that, I would recommend that endorsement is allowed.

00:41:32.940 --> 00:41:34.867
I just had one question, Dan.

00:41:35.062 --> 00:41:35.288
Sure.

00:41:35.629 --> 00:41:43.555
I believe on the zoning, um, they were identifying the frontage for lot number 2 as Crescent Street.

00:41:44.123 --> 00:41:47.890
Would it not be Valentine Street?

00:41:49.824 --> 00:41:51.497
On the zoning decision?

00:41:52.001 --> 00:41:53.284
Yeah, I believe it was the zoning.

00:41:57.228 --> 00:41:58.685
Creating a new lot.

00:42:00.337 --> 00:42:00.771
You're correct.

00:42:00.835 --> 00:42:02.106
It does say on Crescent Street.

00:42:02.588 --> 00:42:02.958
That's right.

00:42:03.392 --> 00:42:04.293
Yeah, it wasn't.

00:42:04.454 --> 00:42:05.435
That should be Valentine.

00:42:05.563 --> 00:42:07.155
That's the only thing that I have.

00:42:13.280 --> 00:42:16.098
I wonder if they can write a scribner's error affidavit to fix that.

00:42:16.147 --> 00:42:16.390
You can.

00:42:16.779 --> 00:42:17.297
I can go to the.

00:42:17.378 --> 00:42:19.111
I'll go to the registry and see if they'll accept that.

00:42:19.533 --> 00:42:22.141
Yeah, whoever drafted this could just probably.

00:42:22.303 --> 00:42:23.833
Well, what happens is it comes.

00:42:25.428 --> 00:42:26.680
The attorney that submits.

00:42:26.969 --> 00:42:28.350
Yeah, in this case, I don't think it was an attorney.

00:42:28.398 --> 00:42:29.345
I think it was Jeff Tallman.

00:42:29.843 --> 00:42:33.712
So whatever they submit for requested relief is what it has to be.

00:42:34.338 --> 00:42:35.494
We can't change that, right?

00:42:35.638 --> 00:42:42.269
So when we read it, we did not pick up on that it was Crescent, or I did not, um, and that should read Valentine.

00:42:42.542 --> 00:42:43.682
But we can work towards resolving it.

00:42:43.730 --> 00:42:44.806
Hopefully it was an attorney.

00:42:45.014 --> 00:42:46.202
You sure it was not an attorney?

00:42:46.459 --> 00:42:46.941
No, it wasn't.

00:42:47.182 --> 00:42:53.378
Okay, because if you see, well, usually on there, I want to say it was, uh, I want to say it was Jeff Tallman did this on his own.

00:42:53.558 --> 00:42:55.416
Okay, because it's just a typo.

00:42:55.595 --> 00:42:56.605
He just made a mistake.

00:42:57.080 --> 00:42:58.663
Yeah, yeah, again, right.

00:42:58.712 --> 00:43:01.717
But the typo carried over onto our paperwork, which you're— which you're right.

00:43:02.218 --> 00:43:07.649
So the— so that myself and the 3 people that reviewed this after me didn't catch it either.

00:43:07.698 --> 00:43:08.613
So it happens.

00:43:08.870 --> 00:43:09.625
Mike, you're sharp.

00:43:10.252 --> 00:43:10.573
Sharp.

00:43:10.879 --> 00:43:14.317
Yeah, fixing it afterwards.

00:43:18.347 --> 00:43:20.754
But I just want— that was the only thing that I had a comment.

00:43:20.851 --> 00:43:25.099
Everything else, pretty much pretty straightforward.

00:43:26.666 --> 00:43:32.341
So how do you approach— how do you approve this?

00:43:32.470 --> 00:43:38.932
Or do you have this, you know, stipulation where that needs to be changed?

00:43:39.434 --> 00:43:41.331
How would you want to work that?

00:43:41.542 --> 00:43:42.369
I can't make the motion.

00:43:42.830 --> 00:43:47.256
I'm just making the observation somebody else has to make the motion, um, as chair.

00:43:47.849 --> 00:43:51.457
So what's the— legally, what would you think?

00:43:51.585 --> 00:43:53.943
I would go to the attorney for a scriptural error affidavit.

00:43:54.071 --> 00:43:57.214
Dan, what do you think in this situation considering who's the engineer?

00:43:57.439 --> 00:44:00.566
I don't— well, it wasn't— it doesn't matter if it was the engineer.

00:44:00.758 --> 00:44:01.752
It was— it's ours.

00:44:02.250 --> 00:44:10.643
My recommendation is that we endorse the plan and we can work towards getting the decision if— yeah, I'm sure the developers are going to want fixed right away so you could sell it.

00:44:11.158 --> 00:44:11.658
I doubt it.

00:44:11.899 --> 00:44:12.705
Yeah.

00:44:13.994 --> 00:44:14.976
No one else is going to pick it up.

00:44:16.326 --> 00:44:17.243
I'll guarantee it.

00:44:17.468 --> 00:44:18.915
But we'll— very good chance you're right.

00:44:19.301 --> 00:44:21.215
I will work towards getting it resolved.

00:44:21.472 --> 00:44:21.585
Yeah.

00:44:22.694 --> 00:44:24.447
I just don't want to kick the can down the road.

00:44:24.527 --> 00:44:28.096
And all of a sudden, why didn't you do what we noticed it?

00:44:28.224 --> 00:44:33.393
But as long as we have some caveat said in the statement, we approve it.

00:44:33.623 --> 00:44:37.325
Well, the variance plan Yeah, that this is based upon.

00:44:37.518 --> 00:44:41.552
Yeah, shows the 75 feet of frontage on Valentine Street.

00:44:41.698 --> 00:44:48.304
It does, but right, but it does— it's the, the, the, the written part of it in the decision says Crescent, right?

00:44:48.660 --> 00:44:57.663
But wait a minute, normally it says— and I don't know if that's the case, it's just a small error.

00:44:58.071 --> 00:45:18.212
No, no, if I was going to buy the land I found out that my front— so, so as it relates to item 1, a variance request, a motion was made by Mr. Sahadi and seconded by Mr. Kelly to grant the variance request in accordance with the plan of record, and that the driveways be shown shall be entirely impervious.

00:45:18.632 --> 00:45:22.038
So the first section is what they requested.

00:45:22.909 --> 00:45:28.980
The vote approves it in accordance with the approved plan which shows 75 feet of Valentine Street.

00:45:30.248 --> 00:45:37.135
So to make an argument, it wasn't for number 1, it was— well, again, item 1 is the request for a variance.

00:45:38.611 --> 00:45:41.437
The vote specifically references the plan of record.

00:45:42.769 --> 00:45:46.847
So item 1 doesn't say that we're granting what item 1 is.

00:45:47.938 --> 00:45:48.083
No.

00:45:49.287 --> 00:45:53.653
In, in my many years of experience in this, it's not something that I would be bothered about.

00:45:53.782 --> 00:46:03.056
But we can still move forward with getting— normally what we'll do in a situation like this is actually correct or even provide a corrected decision and get it recorded.

00:46:05.696 --> 00:46:11.746
As far as an endorsement for the ANR and the recording of that plan, I see no reason why that couldn't proceed.

00:46:16.542 --> 00:46:17.581
I'll motion to endorse.

00:46:17.890 --> 00:46:18.848
I'll second the motion.

00:46:21.400 --> 00:46:22.075
Yes.

00:46:22.429 --> 00:46:22.879
Gloria?

00:46:22.960 --> 00:46:23.297
Yes.

00:46:25.115 --> 00:46:25.372
Yes.

00:46:26.241 --> 00:46:26.401
Yes.

00:46:27.045 --> 00:46:27.752
And Michael Perez?

00:46:27.849 --> 00:46:28.106
Yes.

00:46:29.120 --> 00:46:32.161
With, I guess, the condition that we get things.

00:46:35.745 --> 00:46:36.587
All right, thank you.

00:46:44.501 --> 00:47:07.207
Item number Number 6, or actually number 5 of the new business is proposed 2027 planning board meeting schedule review considerations and proposed planning board meetings dates for the calendar year of 2027.

00:47:08.594 --> 00:47:13.977
So these are all based upon, again, being the second Wednesday of every month unless a holiday kicks things over.

00:47:14.834 --> 00:47:20.802
But, as you know, at any time during the year, if we have an issue with not being able to provide a quorum, we're flexible.

00:47:22.128 --> 00:47:28.263
We normally don't have items on the agenda that require public notification or legal advertisement.

00:47:28.392 --> 00:47:29.664
We're just dealing with A&R plans.

00:47:29.728 --> 00:47:34.123
So, if any time you want to schedule a vacation, or you come up with something, just let us know as soon as you can.

00:47:34.525 --> 00:47:37.100
And, if we need to change the date of a meeting, we can do that.

00:47:38.227 --> 00:47:44.162
But, we are required to submit this to, to the clerk's office just to have on file so they can reserve the room.

00:47:44.634 --> 00:47:48.434
You wouldn't believe what it's like trying to get this room when you want to change the date.

00:47:49.001 --> 00:47:49.535
That's right.

00:47:49.972 --> 00:47:50.425
Yeah.

00:47:53.840 --> 00:47:56.212
So, okay.

00:47:57.567 --> 00:48:00.795
Is everybody okay with setting it how we've been doing it?

00:48:00.956 --> 00:48:01.215
Yes.

00:48:02.021 --> 00:48:03.625
So can I have a motion to approve?

00:48:04.577 --> 00:48:08.630
Motion be scheduled for 2027 for the planning board meetings.

00:48:09.358 --> 00:48:10.199
I second the motion.

00:48:11.266 --> 00:48:11.639
Roll call.

00:48:11.833 --> 00:48:12.043
Beth?

00:48:12.318 --> 00:48:12.447
Yes.

00:48:12.852 --> 00:48:13.467
Gloria?

00:48:13.547 --> 00:48:13.774
Yes.

00:48:13.952 --> 00:48:14.505
Orlando?

00:48:14.586 --> 00:48:14.717
Yes.

00:48:15.074 --> 00:48:16.148
And Michael Ferris?

00:48:18.876 --> 00:48:19.668
Yes.

00:48:19.845 --> 00:48:27.325
Item number 6, approve meeting minutes from August 12, 2026.

00:48:27.440 --> 00:48:30.178
If you need a moment to read through them, give me a minute.

00:48:32.960 --> 00:48:55.548
Do I have a motion to approve the meeting minutes for August 12th, 2018?

00:48:56.399 --> 00:49:02.636
A motion to approve the meetings— I mean, the meetings— the minutes from the last meeting.

00:49:04.877 --> 00:49:05.973
I approve all the meetings.

00:49:07.256 --> 00:49:08.048
I second the motion.

00:49:08.338 --> 00:49:09.906
All right, roll the call, please.

00:49:10.181 --> 00:49:10.601
Beth?

00:49:10.666 --> 00:49:10.892
Yes.

00:49:11.134 --> 00:49:11.732
Gloria?

00:49:11.862 --> 00:49:12.120
Yes.

00:49:12.864 --> 00:49:13.252
Orlando?

00:49:13.413 --> 00:49:13.640
Yes.

00:49:13.963 --> 00:49:14.916
And Michael Ferris?

00:49:16.630 --> 00:49:17.551
Yes.

00:49:18.263 --> 00:49:21.255
Item number 7, citizens input, 3 minutes per citizen.

00:49:22.605 --> 00:49:26.709
We've had people speak on associated with projects already.

00:49:27.455 --> 00:49:28.493
We have nobody in the audience.

00:49:28.915 --> 00:49:32.598
So with that, can I get approval for citizens' input and close?

00:49:33.495 --> 00:49:35.209
Make a motion to close citizens' input.

00:49:36.000 --> 00:49:36.435
I second.

00:49:37.758 --> 00:49:40.145
Beth, we have to have a roll call, please.

00:49:40.322 --> 00:49:40.451
Yes.

00:49:41.290 --> 00:49:42.048
Gloria?

00:49:42.097 --> 00:49:42.355
Yes.

00:49:43.000 --> 00:49:43.548
Orlando?

00:49:43.645 --> 00:49:43.806
Yes.

00:49:44.210 --> 00:49:44.790
And Michael Farage?

00:49:45.016 --> 00:49:45.339
Yes.

00:49:47.058 --> 00:49:48.581
Can I make a motion to adjourn?

00:49:49.569 --> 00:49:50.184
Motion to adjourn.

00:49:51.043 --> 00:49:51.626
And a second?

00:49:53.420 --> 00:49:54.067
Second.

00:49:54.471 --> 00:49:54.632
Yes.

00:49:54.729 --> 00:49:55.295
Gloria?

00:49:55.441 --> 00:49:55.683
Yes.

00:49:55.796 --> 00:49:56.831
Orlando?

00:49:56.977 --> 00:49:57.251
Yes.

00:49:57.462 --> 00:49:59.305
Thank you very much.

00:49:59.418 --> 00:50:00.016
Thank you all.

00:50:00.533 --> 00:50:01.778
Have a great night.

00:50:01.907 --> 00:50:02.344
You also.