8.4.2025 Conservation Commission

Fall River Government TV Aug 5, 2025 YouTube Report Issue

The Fall River Conservation Commission convened on Monday, August 4th, at 5:30 p.m. The meeting began with a roll call, noting the presence of Lewis Ferrer, John Brandt, Jim Cusk, and Tim McCoy, with Chris Bole and Drew Cowine absent. Conservation Agent Dan Aguiar and Recording Clerk Patty Aguiar were also in attendance. Several agenda items were tabled due to ongoing issues or lack of necessary documentation. These included updates on Bell Rock Road, discussion on adopting fees, and outstanding enforcement orders. Notices of Intent for Marco Fritz (565 Detroit Street, inground pool) and John Henry (121 Whitfield Street, single family dwelling) were also tabled as applicants continued to work on their plans or had not submitted required information. A significant discussion revolved around the Notice of Intent SE-24-855 from Weaver Cove Industrial Park LLC for after-the-fact restoration at New Street. Olympia Bowker, representing National Grid, raised concerns that National Grid had not signed the NOI, as some restoration was proposed on their property. Chip N, representing the applicant, and Chris Friedulli of Goddard Consulting, presented a phased restoration plan for the cleared area, acknowledging the unauthorized clearing. The Commission voted to refer the full restoration plan to a third-party consultant for review. Other actions included issuing a negative determination of applicability for Jason Lopes (77 Brierwood Lane, pool installation) after the legal ad was finally placed. Notices of Intent for Liberty Utilities (994 Jefferson Street, gas main installation), One Shaw Street LLC (One Shaw Street, pile installation), and Madison FR Properties (420 Airport Road, parking lot construction) were all tabled due to missing signatures, incomplete plans, or lack of a state file number. Finally, the Commission issued a certificate of compliance to New England Power Company for their substation at 181 Bell Rock Road, confirming the wetland replication area met compliance standards. The minutes from July 7th were approved, and the meeting adjourned.

AI-generated summary. May contain errors. Watch the video to verify.